park background

Municipal Studies and Plans

downtown

Specifications

Studies and Plans

City of Woodstock Strategic Plan

Our Community Strategic Plan and Integrated Community Sustainability Plan was adopted by Council in 2013. The 20-year plan establishes a collective vision to guide Council and staff in creating a desired path for the community to 2031. 

In January 2023, Council directed staff to plan a Strategic Priorities workshop with Council to provide an update on progress towards the goals in the Strategic Plan, identify any new or emerging issues the City needs to address and develop an updated list of priority actions. 

Asset Management

Strategic Asset Management Policy 

Asset Management Plan - 2022

Road Network Report Card

Bridges and Culverts Report Card

Stormwater Network Report Card

Cedar Creek & Southside Park Pond Study

Cedar Creek Study - Completion NoticeContact Engineering Office for copy

Cedar Creek - Presentation 1Contact Engineering Office for copy

Cedar Creek - Presentation 2Contact Engineering Office for copy

Cedar Creek - Presentation 3Contact Engineering Office for copy

Cedar Creek and Southside Pond - Environmental AssessmentContact Engineering Office for copy

Cycling Master Plan

Cycling MP - Notice of Commencement - Contact Engineering Office for a copy

Cycling MP - Summary of Phase 1 and 3 - Consultation Activities - April 2013 - Contact Engineering Office for a copy

Cycling MP - PIC #1 - Notice - Contact Engineering Office for a copy

Cycling MP - Cycling Policies Comment Sheet - February 2013 - Contact Engineering Office for a copy

Cycling MP - PIC #1 - Display Boards - March 2013 - Contact Engineering Office for a copy

Cycling MP - PIC #2 - Notice - Contact Engineering Office for a copy

Cycling MP - Stakeholder Presentation - Contact Engineering Office for a copy

Cycling MP - Chapter 1 - Master Plan Introduction - Contact Engineering Office for a copy

Cycling MP - Chapter 2 - Why a Cycling Master Plan for Woodstock? - Contact Engineering Office for a copy

Cycling MP - Chapter 3 - Summary of Consultation Activities - Contact Engineering Office for a copy

Cycling MP - Chapter 4 - The Proposed Cycling Network for Woodstock - Contact Engineering Office for a copy

Cycling MP - Chapter 5 - A Strategic Implementation Strategy - Contact Engineering Office for a copy

Cycling MP - Chapter 6 - Monitoring the Plan & Next Steps - Contact Engineering Office for a copy

Cycling MP - Vision Objectives and Route Selection Criteria - January 2013 - Contact Engineering Office for a copy

Development Charges Study

DC Study - Notice of Public Meeting: Reading of Woodstock's Development Charges 2022 - Contact Engineering Office for a copy

DC Study - Development Charges Background Study - April 14, 2022  - Contact Engineering Office for a copy

DC Study - Draft 2022 Woodstock Development Charges Bylaw - Contact Engineering Office for a copy

DC Study - Development Charges Background Study - August 11, 2022  - Contact Engineering Office for a copy

DC Study - Notice of Passing of Development Charges By-law #9208-18Contact Engineering Office for copy

DC Study - Development Charges By-law #9208-18Contact Engineering Office for copy

DC Study - Notice of Public Meeting: 2018 Development Charges - May 3, 2018Contact Engineering Office for copy

DC Study - Woodstock Development Charges Background Study - April 6, 2018  - Contact Engineering Office for a copy

DC Study - Draft 2018 Woodstock Development Charges By-lawContact Engineering Office for copy

Downtown Development Plan
Downtown Development Plan
Downtown Streetscape Master Plan
View the Streetscape Master Plan report that was presented to Council on Oct. 6, 2022. The presentation slide deck is also available.
East Woodstock Secondary Plan & Design Study

Industrial Design Guidelines

Appendix A - Official Plan Summaries and ExcerptsContact Engineering Office for copy

Appendix B - Zoning By-law Summaries and ExcerptsContact Engineering Office for copy

Appendix C - City of Woodstock Road Allowances and StandardsContact Engineering Office for copy

Appendix D - Application for Site Plan Control - Introductory NotesContact Engineering Office for copy

Industrial Design GuidelinesContact Engineering Office for copy

 

Municipal Servicing 

Servicing ReportContact Engineering Office for copy

Appendix A - SWMHYMO Input and Output CalculationsContact Engineering Office for copy

Appendix B - SWMF A - E Design DetailsContact Engineering Office for copy

Appendix C - Report FiguresContact Engineering Office for copy

Appendix D - Servicing FiguresContact Engineering Office for copy

Appendix E - Construction Cost EstimatesContact Engineering Office for copy

 

Natural Heritage 

Natural Heritage ReportContact Engineering Office for copy

AppendicesContact Engineering Office for copy

MapsContact Engineering Office for copy

 

Planning and Land Use 

Planning ReportContact Engineering Office for copy

Figures 2 - 1 - Existing ConditionsContact Engineering Office for copy

Figures 2 - 2 - Land Use Plan - County of Oxford Official PlanContact Engineering Office for copy

Figures 2 - 3 - Settlement Strategic Plan - County of Oxford Official PlanContact Engineering Office for copy

Figures 2 - 4 - M.O.E. Land Use Compatibility Guidelines for Class III IndustryContact Engineering Office for copy

Figures 2 - 5 - Existing ZoningContact Engineering Office for copy

Figures 3 - 6 - Land Area CalculationsContact Engineering Office for copy

Figures 3 - 7 - Transportation NetworkContact Engineering Office for copy

Figures 3 - 8 - Preliminary Land Use/Road Plan Option 1Contact Engineering Office for copy

Figures 3 - 9 - Preliminary Land Use/Road Plan Option 2Contact Engineering Office for copy

Figures 3 - 10 - Residential /Business Park InterfaceContact Engineering Office for copy

Figures 3 - 11 - Preliminary Land Use/Road Plan Preferred OptionContact Engineering Office for copy

 

Transportation 

Transportation ReportContact Engineering Office for copy

Appendix A - 1 - Toyota Plant AM Peak HourContact Engineering Office for copy

Appendix A - 2- Toyota PM Plant 1Contact Engineering Office for copy

Appendix A - 3 - Toyota AM Plant 2Contact Engineering Office for copy

Appendix A - 4 - Toyota PM Plant 2Contact Engineering Office for copy

Appendix B - 1 - 2011 Background PM Traffic ForecastContact Engineering Office for copy

Appendix B - 2 - 2021 Background PM Traffic ForecastContact Engineering Office for copy

Appendix C - 1 -Scenario 1: Phase 1 Development with Toyota Plant 1 - PM Peak HourContact Engineering Office for copy

Appendix C - 2 - Scenario 2: Toyota Plant 1 and Phase 1 and 2 of Eastern Lands - PM Peak HourContact Engineering Office for copy

Appendix C - 3 - Scenario 3: Toyota Plant 1 and 2 Eastern Lands Phase 1 and 2 - PM Peak HourContact Engineering Office for copy

Appendix C - 4 - Scenario 4: Toyota Plant 1 and 2 plus Phase 1, 2, and 3 of Eastern LandsContact Engineering Office for copy

Appendix D - 1Contact Engineering Office for copy

Appendix D - 2Contact Engineering Office for copy

Appendix D - 3Contact Engineering Office for copy

Appendix D - 4Contact Engineering Office for copy

Appendix D - 5Contact Engineering Office for copy

Energy Consumption Reports

2020 Energy Consumption Submission

2019 Energy Consumption Submission

2018 Energy Consumption Submission

2017 Energy Consumption Submission

2016 Energy Consumption Submission

2015 Energy Consumption Submission

2014 Energy Consumption Submission

2013 Energy Consumption Submission

2012 Energy Consumption Submission

Northeast Industrial Park Planning & Servicing Study

NE Wdsk Industrial Park - Notice of Study Commencement - Contact Engineering Office for a copy

NE Wdsk Industrial Park - PIC #1 Notice - Contact Engineering Office for a copy

NE Wdsk Industrial Park - PIC #1 Information Boards - Contact Engineering Office for a copy

NE Wdsk Industrial Park - PIC #2 Notice - Contact Engineering Office for a copy

NE Wdsk Industrial Park - PIC #2 Information Boards - Contact Engineering Office for a copy

NE Wdsk Industrial Park - PIC #2 Information Boards-Video - Contact Engineering Office for a copy

NE Wdsk Industrial Park - Integrated Master Plan-Approach #4 - Draft - Contact Engineering Office for a copy

 Norwich & Warwick Area Flooding Environmental Assessment Study

Norwich & Warwick Area Flooding Study - PIC #1 - June 2011 - Contact Engineering Office for a copy

Norwich & Warwick Area Flooding Study - PIC #2 - November 2021 - Contact Engineering Office for a copy

Norwich & Warwick Area Flooding Study - Schedule B Municipal Class EA - July 2012 -  Contact Engineering Office for a copy

Pattullo Avenue - Highway 59 Intersection EA

Pattullo Avenue & HWY 59 - PIC #1 Notice of Commencement - Contact Engineering Office for a copy

Pattullo Avenue & HWY 59 - PIC #1 Display Boards - Contact Engineering Office for a copy

Pattullo Avenue & HWY 59 - PIC #1 Comment Sheet - Contact Engineering Office for a copy

Pattullo Avenue & HWY 59 - PIC #2 Notice  - Contact Engineering Office for a copy

Pattullo Avenue & HWY 59 - PIC #2 Display Boards - Contact Engineering Office for a copy

Pattullo Avenue & HWY 59 - Draft Report MCEA-MP-ESR - November 8, 2021 - Contact Engineering Office for a copy

Pattullo Avenue & HWY 59 - Conceptual Design Set - November 8, 2021 - Contact Engineering Office for a copy

Pattullo Avenue & HWY 59 - Notice of Completion - Contact Engineering Office for a copy

Pattullo Avenue & HWY 59 - Final MCEA Master Plan Environmental Study Report - Contact Engineering Office for a copy

Pattullo Avenue & HWY 59 - Appendices - Contact Engineering Office for a copy

Public Plans

2013 - Asset Management Plan

2016 - Asset Management Plan

2015-2019 Conservation Demand Management Plan

2020-2024 Conservation Demand Management Plan

Municipal Energy Plan

Municipal Energy Plan Brochure

Woodstock Art Gallery Strategic Business Plan

Downtown Asset Management Plan

Community Safety & Well-Being Plan

Recreation Facility Needs Study

Recreation Facility Needs Study - Report

Service Delivery Review - Oxford County Municipalities

Service Delivery Review - Oxford County Municipalities

Southeast Woodstock Expansion

Southeast Woodstock Master Plan Approach #4 Integrated Municipal Class EA Summary Report - (Final) - June 2020 - Contact Engineering Office for a copy

Southeast Woodstock Stormwater Management Strategy (Final) - May 2020 - Contact Engineering Office for a copy

Southeast Woodstock Transportation Needs Analysis Background Report (Final) - July 2020 - Contact Engineering Office for a copy

Southeast Woodstock Wastewater Servicing Report (Final) - June 2020 - Contact Engineering Office for a copy

Southeast Woodstock Water Servicing Report (Final) - June 2020 - Contact Engineering Office for a copy

Southeast Woodstock Natural Heritage Report (Final) - September 2019 - Contact Engineering Office for a copy

Southeast Woodstock Cultural Heritage Assessment Report (Final) - June 2019 - Contact Engineering Office for a copy

Southeast Woodstock Stage 1 Archaeological Assessment (Final) - July 2019 - Contact Engineering Office for a copy

Southeast Woodstock Municipal Comprehensive Review & South-East Secondary Plan - Planning Report December 2019 - Contact Engineering Office for a copy

Southside Wastewater Servicing Strategy Class EA

Notice of CommencementContact Engineering Office for copy

Notice of Process ClosureContact Engineering Office for copy

Transportation Master Plan

The City is undertaking an updated Transportation Master Plan, beginning in 2023. The plan will ensure our existing transportation network is prepared to handle the growth of our City. It will also serve as a road map for the short, medium and long-range transportation infrastructure updates that are needed through to 2043. 

Overall, the plan will guide how we:

  • Develop our roadways.
  • Coordinate infrastructure improvements with land uses.
  • Provide sustainable and integrated transportation facilities, and services to ensure enhanced mobility, accessibility, and connectivity.
  • Respond to future growth and demand on our transportation network.
  • Provide for Active Transportation and multi-modal / complete streets within the City’s built-up communities, to ensure forecasted future traffic volumes are adequately accommodated by the City’s Road Network.

Notice of Study Commencement (August 2023)

2011 Transportation Master Plan

Warwick Area Flooding Study Environmental Assessment 

Notice of Study Commencement - Environmental Assessment Addendum - 2022

Warwick Area Flooding Review

Woodall Baseball & Recreation Complex Studies

Woodall Baseball Complex - NoticeContact Engineering Office for copy

Woodall Baseball Complex - ReportContact Engineering Office for copy

Woodall Baseball Complex - AppendicesContact Engineering Office for copy

Woodstock Transit Study

2019 Transit Operational Review

Contact Us

© 2017 City of Woodstock P.O. Box 1539, 500 Dundas Street, Woodstock, ON N4S 0A7

 

Phone: 519-539-1291
Email: General Information

Back to top

I'd Like To...