Municipal Studies and Plans

City Hall

To help guide the work of the City, staff will undertake various studies or master plans. You can find the most recent versions of most of these strategic documents below. 

City of Woodstock Strategic Plan

Our Community Strategic Plan and Integrated Community Sustainability Plan was adopted by Council in 2013. The 20-year plan establishes a collective vision to guide Council and staff in creating a desired path for the community to 2031. 

In January 2023, Council directed staff to plan a Strategic Priorities workshop with Council to provide an update on progress towards the goals in the Strategic Plan, identify any new or emerging issues the City needs to address and develop an updated list of priority actions. 

You can find an overview of the key goals, objectives and priority actions in our at-a-glance graphic. For more information please visit our Strategic Priorities page.

Asset Management

Learn more about our initiatives on our asset management page.

Strategic Asset Management Policy

Asset Management Plan - 2024

Cedar Creek & Southside Park Pond Study

Cedar Creek Study - Completion NoticeContact Engineering Office for copy

Cedar Creek and Southside Pond - Environmental AssessmentContact Engineering Office for copy

Development Charges Study

DC Study - Development Charges Background Study - April 14, 2022  - Contact Engineering Office for a copy

Downtown Development Plan
Downtown Development Plan
Downtown Streetscape Master Plan
View the Streetscape Master Plan report that was presented to Council on Oct. 6, 2022. The presentation slide deck is also available. Learn more on the Downtown Streetscape Master Plan page. 
East Woodstock Secondary Plan & Design Study

Industrial Design Guidelines

Appendix A - Official Plan Summaries and ExcerptsContact Engineering Office for copy

Appendix B - Zoning By-law Summaries and ExcerptsContact Engineering Office for copy

Appendix C - City of Woodstock Road Allowances and StandardsContact Engineering Office for copy

Appendix D - Application for Site Plan Control - Introductory NotesContact Engineering Office for copy

Industrial Design GuidelinesContact Engineering Office for copy

 

Municipal Servicing 

Servicing ReportContact Engineering Office for copy

Appendix A - SWMHYMO Input and Output CalculationsContact Engineering Office for copy

Appendix B - SWMF A - E Design DetailsContact Engineering Office for copy

Appendix C - Report FiguresContact Engineering Office for copy

Appendix D - Servicing FiguresContact Engineering Office for copy

Appendix E - Construction Cost EstimatesContact Engineering Office for copy

 

Natural Heritage 

Natural Heritage ReportContact Engineering Office for copy

AppendicesContact Engineering Office for copy

MapsContact Engineering Office for copy

 

Planning and Land Use 

Planning ReportContact Engineering Office for copy

Figures 2 - 1 - Existing ConditionsContact Engineering Office for copy

Figures 2 - 2 - Land Use Plan - County of Oxford Official PlanContact Engineering Office for copy

Figures 2 - 3 - Settlement Strategic Plan - County of Oxford Official PlanContact Engineering Office for copy

Figures 2 - 4 - M.O.E. Land Use Compatibility Guidelines for Class III IndustryContact Engineering Office for copy

Figures 2 - 5 - Existing ZoningContact Engineering Office for copy

Figures 3 - 6 - Land Area CalculationsContact Engineering Office for copy

Figures 3 - 7 - Transportation NetworkContact Engineering Office for copy

Figures 3 - 8 - Preliminary Land Use/Road Plan Option 1Contact Engineering Office for copy

Figures 3 - 9 - Preliminary Land Use/Road Plan Option 2Contact Engineering Office for copy

Figures 3 - 10 - Residential /Business Park InterfaceContact Engineering Office for copy

Figures 3 - 11 - Preliminary Land Use/Road Plan Preferred OptionContact Engineering Office for copy

Energy Consumption Reports

The City of Woodstock’s 2020-2024 Conservation and Demand Management Plan

The City of Woodstock’s 2015-2019 Conservation and Demand Management Plan

 

2021 Energy Consumption Submission

2020 Energy Consumption Submission

2019 Energy Consumption Submission

2018 Energy Consumption Submission

 

North Woodstock Facility Feasibility Study

The North Woodstock Facility Feasibility Study will validate recommendations of the 2021 Facility Needs Study regarding a potential community centre at Cowan Fields. The project officially got underway May 2024. The study will make recommendations on possible facility details include size, amenities and estimated construction cost per square foot. It will also include options for phasing in development based on capacity and budgetary needs.

As part of the 2021 Facility Needs Study, a future community centre was recommended to be developed at Cowan Fields (located at 1459 Devonshire Ave.). Some of the amenities that were proposed based on the information available at the time included:

  • A new indoor arena (with the potential for a twin pad based on need)
  • Gym
  • Multi-purpose program/Youth room

As part of the 2024 scope of work, consultants will review historical, current, and forecasted population growth as well as consider changes to the community and recreation trends since the 2021 study. The consultants will also provide comment on water amenities.

The draft report will be presented to Council this fall. 

Norwich & Warwick Area Flooding Environmental Assessment Study

Norwich & Warwick Area Flooding Study - PIC #1 - June 2011 - Contact Engineering Office for a copy

Norwich & Warwick Area Flooding Study - PIC #2 - November 2021 - Contact Engineering Office for a copy

Norwich & Warwick Area Flooding Study - Schedule B Municipal Class EA - July 2012 -  Contact Engineering Office for a copy

Pattullo Avenue - Highway 59 Intersection EA

Pattullo Avenue & HWY 59 - Conceptual Design Set - November 8, 2021 - Contact Engineering Office for a copy

Pattullo Avenue & HWY 59 - Notice of Completion - Contact Engineering Office for a copy

Pattullo Avenue & HWY 59 - Final MCEA Master Plan Environmental Study Report - Contact Engineering Office for a copy

Pattullo Avenue & HWY 59 - Appendices - Contact Engineering Office for a copy

Public Plans

2025-2029 Energy Conservation Demand Management Plan

2013 - Asset Management Plan

2016 - Asset Management Plan

2015-2019 Conservation Demand Management Plan

2020-2024 Conservation Demand Management Plan

Municipal Energy Plan

Municipal Energy Plan Brochure

Woodstock Art Gallery Strategic Business Plan

Community Safety & Well-Being Plan

Recreation Facility Needs Study

Recreation Facility Needs Study - Report

Service Delivery Review - Oxford County Municipalities

Service Delivery Review - Oxford County Municipalities

Southeast Woodstock Expansion

Southeast Woodstock Master Plan Approach #4 Integrated Municipal Class EA Summary Report - (Final) - June 2020 - Contact Engineering Office for a copy

Southeast Woodstock Stormwater Management Strategy (Final) - May 2020 - Contact Engineering Office for a copy

Southeast Woodstock Transportation Needs Analysis Background Report (Final) - July 2020 - Contact Engineering Office for a copy

Southeast Woodstock Wastewater Servicing Report (Final) - June 2020 - Contact Engineering Office for a copy

Southeast Woodstock Water Servicing Report (Final) - June 2020 - Contact Engineering Office for a copy

Southeast Woodstock Natural Heritage Report (Final) - September 2019 - Contact Engineering Office for a copy

Southeast Woodstock Cultural Heritage Assessment Report (Final) - June 2019 - Contact Engineering Office for a copy

Southeast Woodstock Stage 1 Archaeological Assessment (Final) - July 2019 - Contact Engineering Office for a copy

Southeast Woodstock Municipal Comprehensive Review & South-East Secondary Plan - Planning Report December 2019 - Contact Engineering Office for a copy

Stormwater Annual Reports

2023 Annual Stormwater Report

Significant Drinking Water Threat Assessment Report

Transportation Master Plan

The City is undertaking an updated Transportation Master Plan, beginning in 2023. The plan will ensure our existing transportation network is prepared to handle the growth of our City. It will also serve as a road map for the short, medium and long-range transportation infrastructure updates that are needed through to 2043. 

Overall, the plan will guide how we:

  • Develop our roadways.
  • Coordinate infrastructure improvements with land uses.
  • Provide sustainable and integrated transportation facilities, and services to ensure enhanced mobility, accessibility, and connectivity.
  • Respond to future growth and demand on our transportation network.
  • Provide for Active Transportation and multi-modal / complete streets within the City’s built-up communities, to ensure forecasted future traffic volumes are adequately accommodated by the City’s Road Network.

Notice of Study Commencement - Updated Sept. 18, 2024

Notice of PIC #1 - March 20, 2024

Presentation Boards - PIC #1 - March 20, 2024

Notice of PIC #2 - November 20 , 2024

Presentation Boards - PIC #2 - November 20, 2024

 

Transportation Master Plan (January 2011)

Warwick Area Flooding Study Environmental Assessment 

Notice of Study Commencement - Environmental Assessment Addendum - 2022

Warwick Area Flooding Review

Warwick Area Flooding Study - PIC Notice: December 11, 2023

Warwick Area Flooding Study - Environmental Assessment Addendum Notice (2024)

Woodstock Transit Study

2019 Transit Operational Review