Municipal Studies and Plans
Specifications
- Landscape Specifications - Requirement and Guidelines
- Landscape Specifications - Tree Protection
- Water Specifications
Studies and Plans
Asset Management |
Cedar Creek & Southside Park Pond Study |
Cedar Creek Study - Completion Notice - Contact Engineering Office for copy Cedar Creek - Presentation 1 - Contact Engineering Office for copy Cedar Creek - Presentation 2 - Contact Engineering Office for copy Cedar Creek - Presentation 3 - Contact Engineering Office for copy Cedar Creek and Southside Pond - Environmental Assessment - Contact Engineering Office for copy |
Cycling Master Plan |
Commencement Notice (Accessible) Summary of Phase 1 and 3 - Consultation Activities - April 2013 (Accessible) Cycling Policies Comment Sheet - February 2013 (Accessible) PIC #1 - Display Boards - March 2013 (Accessible) Stakeholder Presentation (Accessible) Chapter 1 - Master Plan Introduction (Accessible) Chapter 2 - Why a Cycling Master Plan for Woodstock? (Accessible) Chapter 3 - Summary of Consultation Activities (Accessible) Chapter 4 - The Proposed Cycling Network for Woodstock (Accessible) Chapter 5 - A Strategic Implementation Strategy (Accessible) Chapter 6 - Monitoring the Plan & Next Steps (Accessible) Vision Objectives and Route Selection Criteria - January 2013 (Accessible) |
Development Charges Study |
Notice of Public Meeting: Reading of Woodstock's Development Charges 2022 Development Charges Background Study 2022 (Accessible) Draft 2022 Woodstock Development Charges Bylaw Notice of Passing of Development Charges By-law #9208-18 - Contact Engineering Office for copy Development Charges By-law #9208-18 - Contact Engineering Office for copy Notice of Public Meeting: 2018 Development Charges - May 3, 2018 - Contact Engineering Office for copy Woodstock Development Charges Background Study - April 6, 2018 (Accessible) Draft 2018 Woodstock Development Charges By-law - Contact Engineering Office for copy |
Downtown Development Plan |
Downtown Development Plan |
East Woodstock Secondary Plan & Design Study |
Industrial Design Guidelines Appendix A - Official Plan Summaries and Excerpts - Contact Engineering Office for copy Appendix B - Zoning By-law Summaries and Excerpts - Contact Engineering Office for copy Appendix C - City of Woodstock Road Allowances and Standards - Contact Engineering Office for copy Appendix D - Application for Site Plan Control - Introductory Notes - Contact Engineering Office for copy Industrial Design Guidelines - Contact Engineering Office for copy
Municipal Servicing Servicing Report - Contact Engineering Office for copy Appendix A - SWMHYMO Input and Output Calculations - Contact Engineering Office for copy Appendix B - SWMF A - E Design Details - Contact Engineering Office for copy Appendix C - Report Figures - Contact Engineering Office for copy Appendix D - Servicing Figures - Contact Engineering Office for copy Appendix E - Construction Cost Estimates - Contact Engineering Office for copy
Natural Heritage Natural Heritage Report - Contact Engineering Office for copy Appendices - Contact Engineering Office for copy Maps - Contact Engineering Office for copy
Planning and Land Use Planning Report - Contact Engineering Office for copy Figures 2 - 1 - Existing Conditions - Contact Engineering Office for copy Figures 2 - 2 - Land Use Plan - County of Oxford Official Plan - Contact Engineering Office for copy Figures 2 - 3 - Settlement Strategic Plan - County of Oxford Official Plan - Contact Engineering Office for copy Figures 2 - 4 - M.O.E. Land Use Compatibility Guidelines for Class III Industry - Contact Engineering Office for copy Figures 2 - 5 - Existing Zoning - Contact Engineering Office for copy Figures 3 - 6 - Land Area Calculations - Contact Engineering Office for copy Figures 3 - 7 - Transportation Network - Contact Engineering Office for copy Figures 3 - 8 - Preliminary Land Use/Road Plan Option 1 - Contact Engineering Office for copy Figures 3 - 9 - Preliminary Land Use/Road Plan Option 2 - Contact Engineering Office for copy Figures 3 - 10 - Residential /Business Park Interface - Contact Engineering Office for copy Figures 3 - 11 - Preliminary Land Use/Road Plan Preferred Option - Contact Engineering Office for copy
Transportation Transportation Report - Contact Engineering Office for copy Appendix A - 1 - Toyota Plant AM Peak Hour - Contact Engineering Office for copy Appendix A - 2- Toyota PM Plant 1 - Contact Engineering Office for copy Appendix A - 3 - Toyota AM Plant 2 - Contact Engineering Office for copy Appendix A - 4 - Toyota PM Plant 2 - Contact Engineering Office for copy Appendix B - 1 - 2011 Background PM Traffic Forecast - Contact Engineering Office for copy Appendix B - 2 - 2021 Background PM Traffic Forecast - Contact Engineering Office for copy Appendix C - 1 -Scenario 1: Phase 1 Development with Toyota Plant 1 - PM Peak Hour - Contact Engineering Office for copy Appendix C - 2 - Scenario 2: Toyota Plant 1 and Phase 1 and 2 of Eastern Lands - PM Peak Hour - Contact Engineering Office for copy Appendix C - 3 - Scenario 3: Toyota Plant 1 and 2 Eastern Lands Phase 1 and 2 - PM Peak Hour - Contact Engineering Office for copy Appendix C - 4 - Scenario 4: Toyota Plant 1 and 2 plus Phase 1, 2, and 3 of Eastern Lands - Contact Engineering Office for copy Appendix D - 1 - Contact Engineering Office for copy Appendix D - 2 - Contact Engineering Office for copy Appendix D - 3 - Contact Engineering Office for copy Appendix D - 4 - Contact Engineering Office for copy Appendix D - 5 - Contact Engineering Office for copy |
Energy Consumption Reports |
2019 Energy Consumption Submission 2018 Energy Consumption Submission 2017 Energy Consumption Submission 2016 Energy Consumption Submission 2015 Energy Consumption Submission 2014 Energy Consumption Submission |
Northeast Industrial Park Planning & Servicing Study |
Notice of Study Commencement (Accessible) |
Norwich & Warwick Area Flooding Study |
Norwich and Warwick Area Flooding Environmental Assessment (Accessible) Notice of Completion - Contact Engineering Office for copy Public Information Centre 1 - Contact Engineering Office for copy Public Information Centre 2 - Contact Engineering Office for copy Protecting Your Home - Contact Engineering Office for copy |
Pattullo Avenue - Highway 59 Intersection EA |
Pattullo Avenue & HWY 59 - PIC #1 Notice of Commencement Pattullo Avenue & HWY 59 - PIC #1 Display Boards (Accessible) Pattullo Avenue & HWY 59 - PIC #1 Comment Sheet (Accessible) Pattullo Avenue & HWY 59 - PIC #2 Notice (Accessible) Pattullo Avenue & HWY 59 - PIC #2 Display Boards (Accessible) Pattullo Avenue & HWY 59 - Draft Report MCEA-MP-ESR - November 8, 2021 Pattullo Avenue & HWY 59 - Conceptual Design Set - November 8, 2021 Pattullo Avenue & HWY 59 - Notice of Completion Pattullo Avenue & HWY 59 - Final MCEA Master Plan Environmental Study Report |
Public Plans |
2013 - Asset Management Plan 2016 - Asset Management Plan 2015-2019 Conservation Demand Management Plan 2020-2024 Conservation Demand Management Plan Municipal Energy Plan Municipal Energy Plan Brochure Woodstock Strategic Plan - Contact 519-539-2382 ext. 2102 Museum Square Concept (2018) Woodstock Art Gallery Strategic Business Plan Downtown Asset Management Plan |
Recreation Facility Needs Study |
Recreation Facility Needs Study - Report Recreation Facility Needs Study - Council Presentation |
Service Delivery Review - Oxford County Municipalities |
Service Delivery Review - Oxford County Municipalities |
Southeast Woodstock Expansion |
Notice of Commencement - Contact Engineering Office for a copy PIC#1 - Notice of Public Information Centre (PIC) - Contact Engineering Office for a copy PIC#1 Boards - May 29, 2019 Meeting - Contact Engineering Office for a copy PIC#1 - Comment Form - Contact Engineering Office for a copy PIC#2 - Notice of Public Information Centre (PIC) - Contact Engineering Office for a copy PIC#2 - Presentation - November 8, 2019 - Contact Engineering Office for a copy PIC#2 - Boards - November 8, 2019 - Contact Engineering Office for a copy Southeast Woodstock Stormwater Management Strategy - October 2019 (Accessible) Southeast Woodstock Transportation Needs Analysis Background Report - December 2019 - (Accessible) Southeast Woodstock Wastewater Servicing Report - December 2019 (Accessible) Southeast Woodstock Water Servicing Report - December 2019 (Accessible) Southeast Woodstock Natural Heritage Report - September 2019 (Accessible) Southeast Woodstock Stage 1 Archaeological Assessment (Accessible) |
Southside Wastewater Servicing Strategy Class EA |
Notice of Commencement - Contact Engineering Office for copy Notice of Process Closure - Contact Engineering Office for copy |
Woodall Baseball & Recreation Complex Studies |
Woodall Baseball Complex - Notice - Contact Engineering Office for copy Woodall Baseball Complex - Report - Contact Engineering Office for copy Woodall Baseball Complex - Appendices - Contact Engineering Office for copy |
Woodstock Transit Study |
Notice of Commencement - Contact Engineering Office for copy Notice of Commencement - Ad - Contact Engineering Office for copy Community Stakeholders Meeting Agenda - Contact Engineering Office for copy Community Stakeholders Meeting Comment - Contact Engineering Office for copy Project Report - Contact Engineering Office for copy Appendix A - Record of Consultation - Contact Engineering Office for copy Appendix B - Design Plan - Contact Engineering Office for copy Appendix C - Air Quality Evaluation - Contact Engineering Office for copy Appendix D - Acoustical Engineering Review - Contact Engineering Office for copy PIC - Design Boards - Contact Engineering Office for copy PIC - Network Options - Contact Engineering Office for copy |
Woodstock Transportation Master Plan |
Transportation Master Plan (Accessible) Appendix A - Existing Background Data and Signal Timing Optimization - Contact Engineering Office for copy Appendix B - Existing Traffic Analysis - Contact Engineering Office for copy Appendix C - Rail Warrant Review - Contact Engineering Office for copy Appendix D - Crossing Guard Itinerary - Contact Engineering Office for copy Appendix E - Transportation Master Plan - Public Information Centre #1 - Contact Engineering Office for copy Appendix F - Pedestrian Charters - Contact Engineering Office for copy Appendix G - Parking Report - Contact Engineering Office for copy Appendix H - Warrants for Traffic Control Devices - Contact Engineering Office for copy Appendix I - Future Conditions Traffic Analysis - Contact Engineering Office for copy Appendix J - Transportation Master Plan - Public Information Centre #2 - Contact Engineering Office for copy Appendix K - Road Classification - Contact Engineering Office for copy
|