Municipal Studies and Plans
Specifications
- Landscape Specifications - Requirement and Guidelines
- Landscape Specifications - Tree Protection
- Water Specifications
Studies and Plans
City of Woodstock Strategic Plan |
Our Community Strategic Plan and Integrated Community Sustainability Plan was adopted by Council in 2013. The 20-year plan establishes a collective vision to guide Council and staff in creating a desired path for the community to 2031. In January 2023, Council directed staff to plan a Strategic Priorities workshop with Council to provide an update on progress towards the goals in the Strategic Plan, identify any new or emerging issues the City needs to address and develop an updated list of priority actions. |
Asset Management |
Strategic Asset Management Policy |
Cedar Creek & Southside Park Pond Study |
Cedar Creek Study - Completion Notice - Contact Engineering Office for copy Cedar Creek - Presentation 1 - Contact Engineering Office for copy Cedar Creek - Presentation 2 - Contact Engineering Office for copy Cedar Creek - Presentation 3 - Contact Engineering Office for copy Cedar Creek and Southside Pond - Environmental Assessment - Contact Engineering Office for copy |
Cycling Master Plan |
Commencement Notice (Accessible) Summary of Phase 1 and 3 - Consultation Activities - April 2013 (Accessible) Cycling Policies Comment Sheet - February 2013 (Accessible) PIC #1 - Display Boards - March 2013 (Accessible) Stakeholder Presentation (Accessible) Chapter 1 - Master Plan Introduction (Accessible) Chapter 2 - Why a Cycling Master Plan for Woodstock? (Accessible) Chapter 3 - Summary of Consultation Activities (Accessible) Chapter 4 - The Proposed Cycling Network for Woodstock (Accessible) Chapter 5 - A Strategic Implementation Strategy (Accessible) Chapter 6 - Monitoring the Plan & Next Steps (Accessible) Vision Objectives and Route Selection Criteria - January 2013 (Accessible) |
Development Charges Study |
Notice of Public Meeting: Reading of Woodstock's Development Charges 2022 Development Charges Background Study - April 14, 2022 (Accessible) Draft 2022 Woodstock Development Charges Bylaw Development Charges Background Study - August 11, 2022 (Accessible) Notice of Passing of Development Charges By-law #9208-18 - Contact Engineering Office for copy Development Charges By-law #9208-18 - Contact Engineering Office for copy Notice of Public Meeting: 2018 Development Charges - May 3, 2018 - Contact Engineering Office for copy Woodstock Development Charges Background Study - April 6, 2018 (Accessible) Draft 2018 Woodstock Development Charges By-law - Contact Engineering Office for copy |
Downtown Development Plan |
Downtown Development Plan |
Downtown Streetscape Master Plan |
View the Streetscape Master Plan report that was presented to Council on Oct. 6, 2022. The presentation slide deck is also available. |
East Woodstock Secondary Plan & Design Study |
Industrial Design Guidelines Appendix A - Official Plan Summaries and Excerpts - Contact Engineering Office for copy Appendix B - Zoning By-law Summaries and Excerpts - Contact Engineering Office for copy Appendix C - City of Woodstock Road Allowances and Standards - Contact Engineering Office for copy Appendix D - Application for Site Plan Control - Introductory Notes - Contact Engineering Office for copy Industrial Design Guidelines - Contact Engineering Office for copy
Municipal Servicing Servicing Report - Contact Engineering Office for copy Appendix A - SWMHYMO Input and Output Calculations - Contact Engineering Office for copy Appendix B - SWMF A - E Design Details - Contact Engineering Office for copy Appendix C - Report Figures - Contact Engineering Office for copy Appendix D - Servicing Figures - Contact Engineering Office for copy Appendix E - Construction Cost Estimates - Contact Engineering Office for copy
Natural Heritage Natural Heritage Report - Contact Engineering Office for copy Appendices - Contact Engineering Office for copy Maps - Contact Engineering Office for copy
Planning and Land Use Planning Report - Contact Engineering Office for copy Figures 2 - 1 - Existing Conditions - Contact Engineering Office for copy Figures 2 - 2 - Land Use Plan - County of Oxford Official Plan - Contact Engineering Office for copy Figures 2 - 3 - Settlement Strategic Plan - County of Oxford Official Plan - Contact Engineering Office for copy Figures 2 - 4 - M.O.E. Land Use Compatibility Guidelines for Class III Industry - Contact Engineering Office for copy Figures 2 - 5 - Existing Zoning - Contact Engineering Office for copy Figures 3 - 6 - Land Area Calculations - Contact Engineering Office for copy Figures 3 - 7 - Transportation Network - Contact Engineering Office for copy Figures 3 - 8 - Preliminary Land Use/Road Plan Option 1 - Contact Engineering Office for copy Figures 3 - 9 - Preliminary Land Use/Road Plan Option 2 - Contact Engineering Office for copy Figures 3 - 10 - Residential /Business Park Interface - Contact Engineering Office for copy Figures 3 - 11 - Preliminary Land Use/Road Plan Preferred Option - Contact Engineering Office for copy
Transportation Transportation Report - Contact Engineering Office for copy Appendix A - 1 - Toyota Plant AM Peak Hour - Contact Engineering Office for copy Appendix A - 2- Toyota PM Plant 1 - Contact Engineering Office for copy Appendix A - 3 - Toyota AM Plant 2 - Contact Engineering Office for copy Appendix A - 4 - Toyota PM Plant 2 - Contact Engineering Office for copy Appendix B - 1 - 2011 Background PM Traffic Forecast - Contact Engineering Office for copy Appendix B - 2 - 2021 Background PM Traffic Forecast - Contact Engineering Office for copy Appendix C - 1 -Scenario 1: Phase 1 Development with Toyota Plant 1 - PM Peak Hour - Contact Engineering Office for copy Appendix C - 2 - Scenario 2: Toyota Plant 1 and Phase 1 and 2 of Eastern Lands - PM Peak Hour - Contact Engineering Office for copy Appendix C - 3 - Scenario 3: Toyota Plant 1 and 2 Eastern Lands Phase 1 and 2 - PM Peak Hour - Contact Engineering Office for copy Appendix C - 4 - Scenario 4: Toyota Plant 1 and 2 plus Phase 1, 2, and 3 of Eastern Lands - Contact Engineering Office for copy Appendix D - 1 - Contact Engineering Office for copy Appendix D - 2 - Contact Engineering Office for copy Appendix D - 3 - Contact Engineering Office for copy Appendix D - 4 - Contact Engineering Office for copy Appendix D - 5 - Contact Engineering Office for copy |
Energy Consumption Reports |
2020 Energy Consumption Submission 2019 Energy Consumption Submission 2018 Energy Consumption Submission 2017 Energy Consumption Submission 2016 Energy Consumption Submission 2015 Energy Consumption Submission 2014 Energy Consumption Submission |
Northeast Industrial Park Planning & Servicing Study |
Notice of Study Commencement (Accessible) Notice of Public Information Centre (PIC) #1 (Accessible) Public Information Boards (PIC) #1 (Accessible) Notice of Public Information Centre (PIC) #2 Northeast Industrial Park Planning and Servicing Study PIC #2 Video Northeast Industrial Park Planning and Servicing Study PIC #2 PowerPoint |
Norwich & Warwick Area Flooding Environmental Assessment Study |
Norwich and Warwick Area Flooding Environmental Assessment - 2012 (Accessible) Notice of Completion - Contact Engineering Office for copy Public Information Centre 1 - Contact Engineering Office for copy Public Information Centre 2 - Contact Engineering Office for copy Protecting Your Home - Contact Engineering Office for copy |
Pattullo Avenue - Highway 59 Intersection EA |
Pattullo Avenue & HWY 59 - PIC #1 Notice of Commencement Pattullo Avenue & HWY 59 - PIC #1 Display Boards (Accessible) Pattullo Avenue & HWY 59 - PIC #1 Comment Sheet (Accessible) Pattullo Avenue & HWY 59 - PIC #2 Notice (Accessible) Pattullo Avenue & HWY 59 - PIC #2 Display Boards (Accessible) Pattullo Avenue & HWY 59 - Draft Report MCEA-MP-ESR - November 8, 2021 Pattullo Avenue & HWY 59 - Conceptual Design Set - November 8, 2021 Pattullo Avenue & HWY 59 - Notice of Completion Pattullo Avenue & HWY 59 - Final MCEA Master Plan Environmental Study Report |
Public Plans |
2013 - Asset Management Plan 2016 - Asset Management Plan 2015-2019 Conservation Demand Management Plan 2020-2024 Conservation Demand Management Plan Municipal Energy Plan Municipal Energy Plan Brochure Woodstock Art Gallery Strategic Business Plan Downtown Asset Management Plan |
Recreation Facility Needs Study |
Recreation Facility Needs Study - Report Recreation Facility Needs Study - Council Presentation |
Service Delivery Review - Oxford County Municipalities |
Service Delivery Review - Oxford County Municipalities |
Southeast Woodstock Expansion |
Notice of Commencement - Contact Engineering Office for a copy PIC#1 - Notice of Public Information Centre (PIC) - Contact Engineering Office for a copy PIC#1 Boards - May 29, 2019 Meeting - Contact Engineering Office for a copy PIC#1 - Comment Form - Contact Engineering Office for a copy PIC#2 - Notice of Public Information Centre (PIC) - Contact Engineering Office for a copy PIC#2 - Presentation - November 8, 2019 - Contact Engineering Office for a copy PIC#2 - Boards - November 8, 2019 - Contact Engineering Office for a copy Southeast Woodstock Stormwater Management Strategy - October 2019 (Accessible) Southeast Woodstock Transportation Needs Analysis Background Report - December 2019 - (Accessible) Southeast Woodstock Wastewater Servicing Report - December 2019 (Accessible) Southeast Woodstock Water Servicing Report - December 2019 (Accessible) Southeast Woodstock Natural Heritage Report - September 2019 (Accessible) Southeast Woodstock Stage 1 Archaeological Assessment (Accessible) |
Southside Wastewater Servicing Strategy Class EA |
Notice of Commencement - Contact Engineering Office for copy Notice of Process Closure - Contact Engineering Office for copy |
Warwick Area Flooding Study Environmental Assessment |
Notice of Study Commencement - Environmental Assessment Addendum - 2022 |
Woodall Baseball & Recreation Complex Studies |
Woodall Baseball Complex - Notice - Contact Engineering Office for copy Woodall Baseball Complex - Report - Contact Engineering Office for copy Woodall Baseball Complex - Appendices - Contact Engineering Office for copy |
Woodstock Transit Study |
Woodstock Transportation Master Plan |
Transportation Master Plan (Accessible)
|