park background

Municipal Studies and Plans

downtown

Specifications

Studies and Plans

 Public Plans

Public Works Yard Master Plan - January 2014

2013 - Asset Management Plan

2016 - Asset Management Plan

Conservation Demand Management Plan

Municipal Energy Plan

Municipal Energy Plan Brochure

Woodstock Strategic Plan

Cycling Master Plan

Commencement Notice

Summary - Phase 1

Notice 1

Notice 2

Interactive Display Boards - February

Interactive Display Boards - March

Stakeholder Presentation

Chapter 1

Chapter 2

Chapter 3

Chapter 4

Chapter 5

Chapter 6

Vision Objectives and Route Selection Criteria

Woodstock Transportation Master Plan 

Appendix A - Existing Background Data and Signal Timing Optimization

Appendix B - Existing Traffic Analysis

Appendix C - Rail Warrant Review

Appendix D - Crossing Guard Itinerary

Appendix E - Transportation Master Plan - Public Information Centre #1

Appendix F - Pedestrian Charters

Appendix G - Parking Report

Appendix H - Warrants for Traffic Control Devices

Appendix I - Future Conditions Traffic Analysis

Appendix J - Transportation Master Plan - Public Information Centre #2

Appendix K - Road Classification

Transportation Master Plan

Energy Consumption Reports

2015 Energy Consumption Submission

2014 Energy Consumption Submission

2013 Energy Consumption Submission

2012 Energy Consumption Submission

 Southside Wastewater Servicing Strategy Class EA

Notice of Commencement 

Notice of Process Closure

 Lampman Place Extension

Notice of Commencement

Notice of Completion

Notice of Completion (Reissued)

Notice of Study Commencement

PIC #1 - Comment Sheet

PIC #1 - Display Boards

PIC #1 - Open House Notice

PIC #1 - Options 1 and 2

PIC #1 - Options 3 and 4

PIC #1 Options 3a and 4b

PIC #2 - Comment Sheet

PIC #2 - Open House Notice

PIC #2 - Powerpoint Presentation

Project File Report (Appendix A3, MTCS Built and Cultural Heritage Checklist)

Burgess/Standard Tub Park Master Plan

Burgess and Standard Tube Park Master Plan

Burgess and Standard Tube - Map

Burgess and Standard Tube - Presentation

Maps - 1 - 7

Maps - 8 - 14

Cedar Creek & Southside Park Pond Study

Cedar Creek Study - Completion Notice

Cedar Creek - Presentation 1

Cedar Creek - Presentation 2

Cedar Creek - Presentation 3

Cedar Creek and Southside Pond - Environmental Assessment

Recreation Facility Needs Study

Recreation Facility Needs Study - Report

Recreation Facility Needs Study - Council Presentation

Norwich & Warwick Area Flooding Study

Norwich and Warwick Area Flooding Environmental Assessment

Notice of Completion

Public Information Centre 1

Public Information Centre 2

Protecting Your Home

East Woodstock Secondary Plan & Design Study
 
 Industrial Design Guidelines

Appendix A - Official Plan Summaries and Excerpts 

Appendix B - Zoning By-law Summaries and Excerpts 

Appendix C - City of Woodstock Road Allowances and Standards 

Appendix D - Application for Site Plan Control - Introductory Notes

Industrial Design Guidelines

Municipal Servicing 

Servicing Report

Appendix A - SWMHYMO Input and Output Calculations

Appendix B - SWMF A - E Design Details

Appendix C - Report Figures

Appendix D - Servicing Figures

Appendix E - Construction Cost Estimates

Natural Heritage 

Natural Heritage Report

Appendices

Maps

Planning and Land Use 

Planning Report

Figures 2 - 1 - Existing Conditions

Figures 2 - 2 - Land Use Plan - County of Oxford Offical Plan

Figures 2 - 3 - Settlement Strategic Plan - County of Oxford Official Plan

Figures 2 - 4 - M.O.E. Land Use Compatibility Guidelines for Class III Industry

Figures 2 - 5 - Existing Zoning

Figures 3 - 6 - Land Area Calculations

Figures 3 - 7 - Transportation Network

Figures 3 - 8 - Preliminary Land Use/Road Plan Option 1

Figures 3 - 9 - Preliminary Land Use/Road Plan Option 2

Figures 3 - 10 - Residential /Business Park Interface

Figures 3 - 11 - Preliminary Land Use/Road Plan Preferred Option

Transportation 

Transportation Report

Appendix A - 1 - Toyota Plant AM Peak Hour

Appendix A - 2- Toyota PM Plant 1

Appendix A - 3 - Toyota AM Plant 2

Appendix A - 4 - Toyota PM Plant 2

Appendix B - 1 - 2011 Background PM Traffic Forecast

Appendix B - 2 - 2021 Background PM Traffic Forecast

Appendix C - 1 -Scenario 1: Phase 1 Development with Toyota Plant 1 - PM Peak Hour

Appendix C - 2 - Scenario 2: Toyota Plant 1 and Phase 1 and 2 of Eastern Lands - PM Peak Hour

Appendix C - 3 - Scenario 3: Toyota Plant 1 and 2 Eastern Lands Phase 1 and 2 - PM Peak Hour

Appendix C - 4 - Scenario 4: Toyota Plant 1 and 2 plus Phase 1, 2, and 3 of Eastern Lands

Appendix D - 1

Appendix D - 2

Appendix D - 3

Appendix D - 4

Appendix D - 5

 

Development Charges Study

Notice of Public Meeting: 2018 Development Charges - May 3, 2018

Woodstock Development Charges Background Study - April 6, 2018

Draft 2018 Woodstock Development Charges By-law

Woodall Baseball & Recreation Complex Studies

Woodall Baseball Complex - Notice

Woodall Baseball Complex - Report

Woodall Baseball Complex - Appendices

Woodstock Transit Study

Notice of Commencement

Notice of Commencement - Ad

Community Stakeholders Meeting Agenda

Community Stakeholders Meeting Comment

Project Report

Appendix A - Record of Consultation

Appendix B - Design Plan

Appendix C - Air Quality Evaluation

Appendix D - Acoustical Engineering Review

PIC - Design Boards

PIC - Network Options

 

 

Beards Lane Widening 

Notice of Commencement

Notice of Completion

Notice of Completion (Reissued)

PIC #1 - Comment Sheet

PIC #1 - Display Board

PIC #1 - Open House Notice

PIC #1 - Option 1

PIC #1 - Option 2

PIC #1 - Option 3

PIC #2 - Comment Sheet

PIC #2 - Open House Notice

PIC #2 - PowerPoint Presentation

Project File Report - Appendix A3, MTCS Built $ Cultural Heritage Checklist

Contact Us

© 2017 City of Woodstock P.O. Box 1539, 500 Dundas Street, Woodstock, ON N4S 0A7

 

Phone: 519-539-1291
TTY: 519-539-7268
Email: General Information

Back to top

I'd Like To...